15/10/2020 - Lượt xem: 2883
|
No. |
Contract information |
Project information |
Main tasks of the contract |
Fund |
Implementation period |
Remarks |
|---|---|---|---|---|---|---|
|
1 |
|
- The project on strengthening land management and Vietnam's land database - Fund: IDA International Development Association - Client: Project management unit of the project on strengthening land management and central land database |
Digitization planning of land database includes:
|
IDA |
2019 – present |
Ongoing |
|
2 |
Contract VILG-SL-TS-01.01/HD/DVKT
|
- The project on strengthening land management and land database Fund: IDA International Development Association - Client: Project management unit of the project on strengthening land management and central land database of Son La province using loan of the World Bank |
Digitization planning of land database includes:
|
IDA |
2019 - present |
Ongoing |
|
3 |
|
- Vietnam Sustainable Agriculture Transformation Project Fund: WB - Client: Project Management Unit of Component A Vietnam Sustainable Agricultural Transformation Project (VnSat) |
|
WB |
2018 - 2019 |
Completed |
|
4 |
|
- Client: Project Management Unit of Ministry of Planning and Investment - Pollution Management Project for Industrial Zones of Dong Nai and Nhue-Day river basins |
|
WB |
2017 - 2018 |
Completed |
|
5 |
- Contract No.: 02/HD2014-TV - Consulting service on + Development of Planning Law + Institutional development + Managing the entire project as planned (WP) + Preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection. |
- Project: Project preparation funds - Fund: World Bank ODA - Client: Project Coordination Unit for Project Preparation Fund - Foreign Economic Relations Department, Ministry of Planning and Investment |
- Consulting on development of Planning Law + Consulting on Institutional development + Consulting to manage the entire project as planned (WP) + Consulting to preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection. |
World Bank |
2014-2015 |
Completed |
|
6 |
Contract No. 1210/2013-HDDV - Consulting service on Research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period (2013 – 2020) |
- Project: 00059714 – Assistance in strengthening the capacity of advising, reviewing and monitoring macroscopic economic policies - Fund: UNDP - Client: Economic Committee of National Assembly - Total investment: 6,000 USD
|
- Implement research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period (2013 – 2020) |
UNDP |
2013-2014 |
Completed |
|
7 |
Contract No. 05/CHPOV-TW-CS - Consulting service on Research capacity of district and commune officials
|
- Project: Technical assistance Subproject for preparing Central Highlands Poverty Reduction Project - Fund: WB - Client: PMU of Central Highlands Poverty Reduction project - Total investment: 150,000,000 USD - Project Group A |
- Conduct a capacity assessment study for district and commune officials
|
World Bank |
2013 - 2014 |
Completed |
|
8 |
Contract No. 11/2016/HDTV/ICT-BV Cho Ray - Consultancy service on Development of Master Plan Scale 1/500 |
- Project: Construction of facility II - Cho Ray Hospital - Fund: Japan ODA - Client: Cho Ray Hospital - Total investment of the period: USD 287,957,000 (equivalent to VND 5,702,982,000,000) - Project Group A/level I |
Development of Master Plan Scale 1/500 |
Japan ODA |
2014-2015 |
|
|
.. |
... |
... |
... |
... |
... |
... |
|
The Company will present contracts upon request. |
||||||
|
|
|
|
|
|
|
|
|
No. |
Contract information |
Project information |
Main tasks of the contract |
Fund |
Implementation period |
Remarks |
|||
|
1 |
- Contract No.: 12/2019/HD-TV - Consultancy service on Surveying, planning construction investment projects |
- Project: Building a smart urban area in Sam Son city - Fund: State Budget - Client: PMU of Sam Son city construction investment project - Total investment: VND 29,300 billion - Project Group C |
Consultancy on surveying, preparing construction investment projects |
State Budget |
2019 |
Ongoing |
|||
|
2 |
- Contract No.: 01/2017/ODAVN-FL - Providing consulting service on preparing feasibility study report for the project on investment and equipment of fire and rescue vehicles for Vietnam Fire Fighting and Rescue Police force, phase 3 using ODA of the Government of Finland |
- Project: Investment and equipment of fire and rescue vehicles for Vietnam Fire and Rescue Police force, phase 3 using ODA of the Government of Finland - Fund: Finland - Client: Vietnam Fire and Rescue Police - Total investment: VND 409 billion - Project Group: B |
|
Finland |
2019 |
Ongoing |
|||
|
3 |
- Contract No.: 07/2018/HDTV-QLDA - Consultancy service on Preparation of feasibility study report |
- Project: Investment in equipment for Tuberculosis and Lung Specialized Hospital in Binh Duong Province - Fund: State Budget - Client: PMU of Construction Investment Project of Binh Duong Province |
|
State Budget |
2018 |
Ongoing |
|||
|
4 |
- Contract No.: 02/2017/HDTV - Consultancy service on Adjustment (or updating) of feasibility study report (FS) |
- Project: Mekong Delta Region Urban Upgrading Project - My Tho City sub-project - Fund: State Budget - Client: PMU of Mekong Delta Region Urban Upgrading Project - My Tho City - Total investment: VND 814,114 billion - Project Group A/level I |
|
State Budget |
2017 |
Completed |
|||
|
5 |
- Contract No.: 02/2017/HDTV - Consultancy service on Adjustment (or updating) of feasibility study report (FS) |
- Project: Mekong Delta Region Urban Upgrading Project – Cao Lanh City sub-project - Fund: State Budget - Client: Cao Lanh City People's Committee - Representative of the Client: PMU of Mekong Delta Region Urban Upgrading Project – Cao Lanh City - Total investment of the period: VND 1,460 billion - Project Group A/level I |
|
State Budget |
2017 |
Completed |
|||
|
6 |
- Contract No.: 01/2017/HDTV-ODA - Consultancy on preparing investment project |
- Project: Project on Construction of Hai Phong General Hospital - Part I (part using ODA loans) using Korean ODA loans. - Fund: Korea ODA - Governing agency: Hai Phong City People's Committee - Client: Hai Phong Department of Health - Project management unit: PMU of the project on Construction Viet Tiep Friendship Hospital facility 2 (under Hai Phong Department of Health) - Total investment of the period: USD 104,000,000 - Project Group A/ level I |
|
Korea ODA |
2017 |
Completed |
|||
|
7 |
- Contract No.: 01/ODAVN-KOR - Consultancy service on Providing consulting services for the project "Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police Force using soft loans from the Economic Development Cooperation Fund (EDCF) of Korea” |
- Project: Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police Force using soft loans from the Economic Development Cooperation Fund (EDCF) of Korea - Fund: Korea ODA - Client: Vietnam Fire and Rescue Police Department - Total investment: USD 20,000,000 - Project Group A |
- Preparing feasibility study report, design, estimates - Preparing bidding document, bids evaluation for packages (i) supply of fire and rescue vehicles and (ii) entrusted import package - Preparing Baseline survey - Preparing Mid survey - Preparing Final report - Preparing impact assessment report of the project |
Korea ODA |
2015 - 2021 |
Ongoing |
|||
|
8 |
- Contract No.: 02/HDTV/BQLTDA HTKT/ICT/Tan Phong - Consultancy on construction of documents of the "Northern mountainous urban program - Bac Kan Town", surveying, preparing construction investment projects, designing construction drawings and estimates, preparing bidding document, environmental impact assessment report for investment items phase I (2015 - 2016) |
- Northern mountainous urban program - Bac Kan Town subproject - Fund: ODA of WB - Client: People's Committee of Bac Kan Town - Total investment: USD 270,000,000 - Project Group A/ level I |
- Construction of documents of the "Northern mountainous urban program - Bac Kan Town (Feasibility study report) + Surveying, preparing construction investment projects + Designing construction drawings and estimates + Preparing bidding document, bids evaluation for consultant selection on construction and consultancy + Environmental impact assessment report for investment items phase I (2015-2016) + Social impact assessment report (SA) |
World Bank |
2014-2015 |
Completed |
|||
|
9 |
- Contract No.: 08/2014/HDTV/ICT-BV Chợ Rẫy - Consultancy service on project preparation (Feasibility study report) |
- Project: Construction of facility II - Cho Ray Hospital - Fund: Japan ODA - Client: Cho Ray Hospital - Total investment of the phase: USD 287,957,000 (equivalient to VND 5,702,982,000,000) - Project Group A/ level I |
- Preparing investment project (Feasibility study report) Project on Construction of facility II - Cho Ray Hospital |
Japan ODA |
2014-2015 |
Completed |
|||
|
10 |
- Contract No.: 090714/ICT-BVNDC - Consultancy service on project planning |
- Project: Construction of Ben Tre General Hospital - Fund: Korea ODA - Client: Nguyen Dinh Chieu Hospital - Total investment: 78,344,000 USD - Project Group A/ level I |
- Preparing investment project |
Korea ODA |
2014-2015 |
Completed |
|||
|
11 |
- Contract No.: 040515/TV/ICT-BV An Giang - Consultancy service on investment project planning |
- Project: Supply of equipment for An Giang General Hospital - Fund: ODA of Austrian Government - Client: An Giang Central General Hospital |
- Preparing investment project |
Austria ODA |
2015-2016 |
Completed |
|||
|
12 |
- Contract No.: 010315/HD/ICT-TTYTTP Quy Nhon - Consultancy service on investment project planning |
- Project: Supply of medical equipment for Quy Nhon General Hospital - Binh Dinh Province using EDCF loans of Korea - Fund: Korea ODA - Client: Quy Nhon City Medical Center - Total investment: 3,000,000USD |
- Preparing investment project |
Korea ODA |
2015-2016 |
Completed |
|||
|
13 |
- Contract No.: 18/TV/ICT-DHDDND - Consultancy service on preparing economic-technical report |
- Project: Wastewater treatment system of Nam Dinh Nursing University - Fund: State budget - Client: Nam Dinh Nursing University Total investment: 6,500,000,000 VND |
- Preparing economic-technical report |
State budget |
2016 |
Completed |
|||
|
14 |
- Contract No.: 06/2014/ICT-BVDT/HDTV - Consultancy service on preparation of feasibility study report
|
- Project: Supply of medical equipment for Duc Tho General Hospital - Ha Tinh Province - Fund: ODA of the Government of Korea - Client: Duc Tho General Hospital - Total investment: 3,000,000 USD |
- Preparing feasibility study report - Prepare bidding documents, evaluate bids to select contractor to supply and install medical equipment for the Hospital. - Consultancy on supervision of medical equipment installation |
Korea ODA |
2014 |
Completed |
|||
|
15 |
- Contract No.: 01/2013/SYT-HDLDA - Consultancy service on investment project planning |
- Project: Capacity building for health sector in Thua Thien Hue province using ODA of the Italian government - Fund: Italy ODA - Client: Thua Thien Hue Department of Health |
- Preparing investment project |
Italy ODA |
2013-2014 |
Completed |
|||
|
16 |
- Contract No.: 19/0912/HD-TV - Consultancy service on construction investment project planning |
- Project: Construction of Hanoi Pharmacy University facility in Bac Ninh - Fund: Korea ODA - Client: Hanoi University of Pharmacy - Total investment: 50,000,000USD - Project group A/level I |
- Preparing construction investment project |
Korea ODA |
2012-2014 |
Completed |
|||
|
17 |
- Contract No.: 38/2012/HDTV - Consultancy service on Preparing investment project planning |
- Project: Construction and expansion of Quang Ngai City Water supply system from 20,000m3 to 45,000m3/day - Fund: ADB - Client: Quang Ngai Water Supply and Construction Joint Stock Company - Total investment: 20,000,000 USD |
- Preparing investment project |
ADB |
2012 - 2013 |
Completed |
|||
|
18 |
- Contract No.: 79B/2011/HD-TN&PTDT - Consultancy service on Preparing construction investment project, geological topographic survey, environmental impact assessment, social survey report, resettlement report |
- Project: Collection and treatment of wastewater in Long Dien town, Long Dien district, Ba Ria Vung Tau province - Fund: Spain ODA - Client: Ba Ria Vung Tau Urban Sewerage and Development One Member Limited Company - Total investment: 100,000,000 USD - Project group A/level I |
|
Spain ODA |
2011 - 2013 |
Completed |
|||
|
19 |
- Contract No.: 74/ICT-BVDKLT/HDTV
|
- Project: Supply of medical equipment for Lac Thuy General Hospital - Hoa Binh Province - Fund: ODA of the Government of Korea - Client: PMU of basic construction project of Lac Thuy district - Total investment: 3,000,000 USD |
|
Korea ODA |
2010 |
Completed |
|||
|
20 |
- Contract No.: 706/ICT-BVDKTC/HDTV - Consultancy service on preparation of feasibility study report
|
- Project: Supply of medical equipment for Tan Chau General Hospital - An Giang province - Fund: ODA of the Government of Korea - Client: Tan Chau General Hospital - Total investment: 3,000,000 USD |
- Prepare feasibility study report
|
Korea ODA |
2010 |
Completed |
|||
|
21 |
- Contract No.: 08/ICT-BVChau Doc/HDTV - Consultancy service on preparation of feasibility study report
|
- Project: Supply of medical equipment for 500-bed Chau Doc Regional General Hospital - An Giang province. - Fund: ODA of the Kuwait government - Client: Chau Doc Regional General Hospital - Total investment: 3,400,000 KWD (equivalent to 251,110,400,000VND) |
- Prepare feasibility study report
|
Kuwait ODA
|
2012 |
Completed |
|||
|
22 |
- Contract No.: 688/ICT-DKCM/HDTV - Consultancy service on: + Preparation of feasibility study report + Preparation of bidding documents, bids evaluation + Supervision of equipment installation |
- Project: Supply of medical equipment for Ca Mau General Hospital funded by EDCF from the Korean Government. - Fund: Korea ODA - Client: Ca Mau Department of Health - Total investment: 3,000,000 USD |
- Prepare feasibility study report - Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital. - Consultancy on supervision of medical equipment installation |
Korea ODA |
2009-2012 |
Completed |
|||
|
23 |
- Contract No.: 672/ICT-BVHT/HDTV - Consultancy service on: + Preparation of feasibility study report + Preparation of bidding documents, bids evaluation + Supervision of equipment installation |
- Project: Supply of medical equipment for Ha Trung District General Hospital - Thanh Hoa province - Fund: Korea ODA - Client: Ha Trung District General Hospital - Total investment: 3,000,000 USD |
- Prepare feasibility study report - Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital. - Consultancy on supervision of medical equipment installation |
Korea ODA |
2008-2010 |
Completed |
|||
|
The Company will present contracts upon request. |
|||||||||
|
No. |
Contract information |
Project information |
Main tasks of the contract |
Fund |
Implementation period |
Remarks |
|
1 |
- Contract No.: 09/ICT-BVChau Doc/HDTV - Consultancy service on project management
|
- Project: Supply of medical equipment for 500-bed Chau Doc Regional General Hospital - An Giang province. - Fund: ODA of the Kuwait government - Client: Chau Doc Regional General Hospital - Total investment: 3,400,000 KWD (equivalent to 251,110,400,000VND) |
- Consultancy on project management for the whole project. |
Kuwait ODA
|
2017-present |
Ongoing |
|
2 |
- Contract No.: 02/HD2014-TV - Consultancy service on: + Development of the Planning Law + Institutional building + Managing the whole project as planned (WP) + Preparing bidding documents, evaluating bids for 1 non-consulting package, and 14 packages for consultant selection. |
- Project: Project preparation fund - Fund: World Bank ODA - Client: Project Coordination Unit of the Project Preparation Fund - Foreign Economic Relations Department, Ministry of Planning and Investment |
- Consultancy on development of the Planning Law + Consultancy on Institutional building + Consultancy on managing the whole project as planned (WP) + Consultancy on preparing bidding documents, evaluating bids for 1 non-consulting package, and 14 packages for consultant selection. |
World Bank |
2014-2015 |
Completed |
|
3 |
- Contract No.: 681009/HDTV/ICT-Quảng Bình - Consultancy service on project management
|
- Project: Supply of vocational training equipment for Quang Binh Vocational Intermediate School using EDCF loans of the Korean Government. - Fund: Korea ODA - Client: Quang Binh vocational intermediate school - Total investment: 3,000,000 USD |
- Consultancy on project management for the whole project. |
Korea ODA |
2011-2013 |
Completed |
|
4 |
- Contract No.: 090711/ICT-DKCM/HDTV - Consultancy service on project management
|
- Project: Supply of medical equipment for Ca Mau General Hospital using EDCF loans of the Korean Government. - Fund: Korea ODA - Client: Ca Mau Department of Health - Total investment: 3,000,000 USD |
- Consultancy on project management for the whole project. |
Korea ODA |
2011-2013 |
Completed |
|
... |
... |
... |
... |
... |
... |
... |
|
The Company will present contracts upon request. |
|
No. |
Contract information |
Project information |
Main tasks of the contract |
Fund |
Implementation period |
Remarks |
|
|
1 |
- Contract No.: 06/HDTV/DDND-ICT - Consultancy service on Supervision of construction and equipment installation |
- Project: Wastewater treatment system of Nam Dinh Nursing University - Fund: State budget - Client: Nam Dinh Nursing University - Total investment: 15 billion - Project group C |
- Supervision of construction and equipment installation |
World Bank |
2019-present |
Ongoing |
|
|
2 |
- Contract No.: 06/HD-ICT - Consultancy service on Supervision of construction and equipment installation |
- Project: Construction of wastewater treatment system for Vietnam University of Traditional Medicine - Fund: State budget - Client: Vietnam University of Traditional Medicine - Total investment: 5 billion - Project group C |
- Supervision of construction and equipment installation |
World Bank |
2018-2019 |
Completed |
|
|
3 |
- Contract No.: 09/GS/ICT-APVE - Consultancy service on Supply of consulting service on supervision of construction and equipment installation |
- Project: Construction of Vietnamese German University - Fund: World Bank ODA - Client: PMU of the project ton Construction of Vietnamese German University - Total investment: 100,000,000 USD - Project group A/level I |
- Supervision of construction and equipment installation |
World Bank |
2016-present |
Ongoing |
|
|
4 |
- Contract No.: 56/2016/HD-TVXD - Consultancy service on Supervision of construction, procurement and installation of equipment for centralized wastewater treatment plant (phase I)
|
- Project: Da Nang high-tech park project - Fund: State budget - Client: PMU of the project on investment and construction of Da Nang high-tech park project
|
- Supervision of construction, procurement and installation of equipment for centralized wastewater treatment plant (phase I – Da Nang high-tech park project) |
State budget |
2016-present |
Ongoing |
|
|
5 |
- Contract: - Consulting services on design and construction supervision - Project on Construction of Ca Mau city water drainage and waste water treatment system |
- Project: Construction of Ca Mau city water drainage and waste water treatment system - Fund: Italy ODA - Client: Ca Mau Water Supply-Sewerage & Urban Works Company Limited - Total investment: 13,000,000USD - Project group A/level I |
- Consultancy on detailed design, - Preparation of bidding document, bids evaluation for construction contractor selection – Supervision of construction |
Italy ODA |
2012-present |
Ongoing |
|
|
6 |
- Contract No.: 13/MOF-ICT/2013 - Consultancy service on: + Procurement procedures + Supervision of equipment handover and installation
|
- Project: Water sector aid program for improvement of payment balance - Fund: Italy ODA - Client: Department of Debt Management – Ministry of Finance - Total investment: 2,400,000EURO |
- Preparation of bidding document, bids evaluation - Supervision of equipment handover and installation |
Italy ODA |
2013 |
Completed |
|
|
7 |
- Contract No.: 05/2015/GS/ICT-SNHY - Consultancy service on supervision of equipment installation |
- Project: Construction and procurement of medical equipment for Hung Yen Obstetrics and Pediatrics Hospital - Fund: State budget - Client: Hung Yen Obstetrics and Pediatrics Hospital |
- Supervision of equipment installation |
State budget |
2015-2016 |
Completed |
|
|
8 |
- Contract No.: 07/2015/GS/ICT-SNHY - Consultancy service on construction supervision and equipment procurement and installation for medical gas supply station |
- Project: Construction and procurement of medical equipment for Hung Yen Obstetrics and Pediatrics Hospital - Fund: State budget - Client: Hung Yen Obstetrics and Pediatrics Hospital |
- Construction supervision and equipment procurement and installation for medical gas supply station |
State budget |
2015-2016 |
Completed |
|
|
9 |
- Contract No.: 688/ICT-DKCM/HDTV - Consultancy service on: + Preparation of feasibility study report + Preparation of bidding documents, bids evaluation + Supervision of equipment installation |
Project: Medical equipment supply for Ca Mau General Hospital funded by EDCF of Korean Government - Fund: Korea ODA - Client: Ca Mau Department of Health - Total investment: 3,000,000 USD |
- Prepare Feasibility Study Report - Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital. - Consultancy on supervision of medical equipment installation |
Korea ODA |
2009-2012 |
Completed |
|
|
10 |
- Contract No.: 672/ICT-BVHT/HDTV - Consultancy service on: + Preparation of feasibility study report + Preparation of bidding documents, bids evaluation + Supervision of equipment installation |
- Project: Supply of medical equipment for Ha Trung District General Hospital - Thanh Hoa province - Fund: Korea ODA - Client: Ha Trung District General Hospital - Total investment: 3,000,000 USD |
- Prepare Feasibility Study Report - Prepare bidding documents, evaluate bids to select contractor for supply and installation of medical equipment for the hospital. - Consultancy on supervision of medical equipment installation |
Korea ODA |
2008-2010 |
Completed |
|
|
... |
... |
... |
... |
... |
... |
... |
|
|
The Company will present contracts upon request. |
|||||||
|
|
|
|
|
|
|
|
|
5. LIST OF CONTRACTS ON RESEARCH AND EVALUATION (ME) IMPLEMENTED RECENTLY BY ICT
|
No. |
Contract information |
Project information |
Main tasks of the contract |
Fund |
Implementation period |
Remarks |
||
|
1 |
|
- Project: Brand building and development - Fund: State budget - Client: Ben Tre Department of Science and Technology |
|
State Budget |
2017-2019 |
Completed |
||
|
2 |
|
- Vietnam Sustainable Agriculture Transformation Project Fund: WB - Client: Project Management Unit of Component A Vietnam Sustainable Agricultural Transformation Project (VnSat) |
|
WB |
2018 - 2019 |
Completed |
||
|
3 |
|
Component Project on Rural Hygiene and Sanitation Behavior Change under the Results-based Rural Water and Sanitation Expansion Program, using loans of the World Bank Fund: WB - Client: Health Environment Management Agency |
|
WB |
2018 - 2019 |
Completed |
||
|
4 |
|
|
|
WB |
2017 - 2018 |
Completed |
||
|
5 |
|
- Project: Domestic water supply of Quang Trach district, Quang Binh province - Fund: Hungary ODA - Client: People's Committee of Quang Trach district - Client's representative: Quang Trach ODA project management unit - Total investment: - Project Group A |
- Consultancy on preparing final evaluation monitoring report (M&E),
- Consultancy on assessing the implementation situation during the operation exploitation phase of the project. |
Hungary ODA |
2017 |
Completed |
||
|
6 |
- Contract No.: CQS1-16 - Consulting service on preparing Mid survey |
- Project: North-East and Red River Delta Regions Health System Support Project (Norred) - Fund: WB - Client: Central Project Management Unit, North-East and Red River Delta Regions Health System Support Project - Total investment: 150,000,000 USD - Project Group A |
- Preparing Mid survey of the project, including: (i) Inception Report; (ii) Research, survey on poor patients/women and children/ethnic minorities; (iii) Report the results of data collection; (iv) Independent mid survey on evaluation of project implementation results; (v) Organize workshops to report, share results of the Report, and other workshops and training courses. |
World Bank |
2017 |
Completed |
||
|
7 |
- Contract No.: CQS 2.15 - Consulting service on Researching, evaluating and supporting to improve hospital quality |
- Project: North-East and Red River Delta Regions Health System Support Project (Norred) - Fund: WB - Client: Central Project Management Unit, North-East and Red River Delta Regions Health System Support Project - Total investment: 150,000,000 USD - Project Group A |
- Research, evaluate and support to improve hospital quality, including: (i) Detailed plan to perform the tasks of the contract and submit to the PMU; (ii) Research, survey on poor patients/women and children/ethnic minorities; (iii) Report on the current status of hospital management capacity and hospital quality management; (iv) Master plan and annual detailed plan on hospital management and hospital quality improvement for the project in the period 2015-2020 of the Central PMU; (v) The project hospital's implementation plan template for hospital management and hospital quality improvement for the project each year and the whole period from 2015 to 2020; (vi) A set of indicators and tools to evaluate the progress and results of the implementation of the master plan, the detailed plan of the hospital management and hospital quality improvement for the project in the period 2015-2020; (vii) 3 conference planning and support participation; (viii) Designing and establishing a supporting training and consultancy unit as mentioned in part of the capacity building master plan for 2015-2020; (ix) Report the results of the pilot implementation of the hospital management andhospital quality improvement model according to the master and detailed plan of the hospital management andhospital quality improvement for the project in the period 2015-2020. |
World Bank |
2016-2018 |
Ongoing |
||
|
8 |
- Contract No.: 15/HD-PPTAF01 - Consulting service on Resettlement Planning and Resettlement Action Policy Framework (RAP) and Project Due Diligence Report (DDR) |
- Project: Technical Assistance Subproject for the preparation of the flood risk management project in Ho Chi Minh City - Fund: WB - Client: Construction Project Management Unit - Total investment: 450,000,000 USD - Project group A/level I |
Prepare Resettlement Action Plan (RAP) and Resettlement Action Policy Framework (RPF) and Project Due Diligence Report (DDR) include:
|
World Bank |
2015-2017 |
Completed |
||
|
9 |
- Contract No.: 01/ODAVN-KOR - Consulting service on Providing consulting service for the project fire and rescue “Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police force- using the soft loan of Korea EDCF” |
Project: Investment and equipment of vehicles and enhancing capacity for Vietnam Fire and Rescue Police force- using the soft loan of Korea EDCF - Fund: Korea ODA - Client: Vietnam Fire and Rescue Police Department - Total investment: 20,000,000USD - Project group A |
- Preparation of investment project, design, estimates - Preparation of bidding documents, bids evaluation for the packages (i) Supply of fire and rescue vehicles and (ii) the entrusted import package - Preparation of Baseline survey - Preparation of Mid survey - Preparation of Final report - Preparation of project impact assessment Report
|
Korea ODA |
2015 - 2021 |
Ongoing |
||
|
10 |
- Contract No.: CPMU.CQS1/2014 - Consulting service on preparing Baseline survey of the project
|
- Project: North-East and Red River Delta Regions Health System Support Project (Norred) - Fund: WB - Client: Central Project Management Unit, North-East and Red River Delta Regions Health System Support Project - Total investment: 150,000,000 USD - Project Group A |
Preparation of Baseline survey of the project, including: (i) Inception report; (ii) Research, survey on poor patients/women and children/ethnic minorities; (iii) Report on initial investigation activities; (iv) data analysis and processing reports; (v) Monitoring and evaluation Manual; (vi) Baseline survey |
World Bank |
2014-2016 |
Completed |
||
|
11 |
- Contract No.: 09/DGTDMT/ICT-BVNDC - Consulting service on Preparing environmental impact assessment (EIA) report |
- Project: Construction of Ben Tre General Hospital - Fund: Korea ODA - Client: Nguyen Dinh Chieu Hospital - Total investment: 78,000,000 USD - Project group A/level I |
- Prepare environmental impact assessment (EIA) report |
Korea ODA |
2015-2017 |
Completed |
||
|
12 |
- Contract No.: 767/2014-HD - Consulting service on Preparing social impact assessment (SIA) report, resettlement plan and resettlement action plan (RAP) |
- Project: Technical assistance subproject for preparation of “Ho Chi Minh Green Transport Development Project” - Fund: WB - Client: Urban-civil Works Construction Investment Management Authority of Ho Chi Minh - Total investment :150,000,000 USD - Project group A/level I |
Prepare social impact assessment (SIA) report, resettlement plan and resettlement action plan (RAP), including: Review and analyze missing spots of existing reports; Collect data, documents related to the project; Zone, identify of affected areas and scales, identify of affected households, affected assets on land; Socio-economic survey of affected households and making report Research, investigation and evaluation on gender equality Organize public consultation, government agencies. Set up a resettlement action policy framework: Resettlement Action Plan Due Deligence Report of the project in accordance with the policies and regulations of the Government and the World Bank |
World Bank |
2015 - 2016 |
Completed |
||
|
13 |
- Contract No.: 02/HDTV/BQLTDA HTKT/ICT/Tan Phong - Consulting service on developing the document "Program in the Northern mountains region - Bac Kan Town"), conducting survey, establishment of construction investment projects, Construction drawing design and cost estimation, making the bidding documents, Environmental impact assessment report for investment items in Phase I (2015 – 2016) |
- Urban development program in the northern mountains region – Bac Kan town subproject - Fund: World Bank ODA - Client: Bac Kan Town People’s Committee - Total investment: 270,000,000 USD - Project group A/level I |
- Development of the document " Program in the northern mountains region - Bac Kan Town") (Feasibility study report) - Conducting survey, establishment of construction investment projects - Construction drawing design and cost estimates - Preparing the bidding documents, bids evaluation for selection of construction contractor and consultancy contractor - Environmental Impact Assessment (EIA) for investment items in Phase I (2015-2016) - Social Impact Assessment Report (SA) + Research, investigation and evaluation on gender equality + Research, investigation and evaluation of ethnic minorities |
World Bank |
2014-2015 |
Completed |
||
|
14 |
Contract - Consulting service on Assistance in assessing impacts of Water Supply and Sanitation Program on diseases of under-five children
|
- Project: Child survival and development project - Fund: UNICEF - Client: Management Unit of child survival and development project - Health Environment Management Agency
|
|
UNICEF |
2014-2015 |
Completed |
||
|
15 |
- Contract No.: 02/HD2014-TV - Consulting service on + Development of Planning Law + Institutional development + Managing the entire project as planned (WP) + Preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection. |
- Project: Project preparation funds - Fund: World Bank ODA - Client: Project Coordination Unit for Project Preparation Fund - Foreign Economic Relations Department, Ministry of Planning and Investment |
- Consulting on development of Planning Law + Consulting on Institutional development + Consulting to manage the entire project as planned (WP) + Consulting to preparing bidding documents, bids evaluation for 1 non-consulting package, and 14 packages on consultant selection. |
World Bank |
2014-2015 |
Completed |
||
|
16 |
Contract No. 1210/2013-HDDV - Consulting service on Research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period (2013 – 2020) |
- Project: 00059714 – Assistance in strengthening the capacity of advising, reviewing and monitoring macroscopic economic policies - Fund: UNDP - Client: Economic Committee of National Assembly - Total investment: 6,000 USD
|
- Implement research on Renovating the institution of managing, utilizing and monitoring ODA capital for stronger sustainability of foreign debts and national debts of Vietnam in a new development period (2013 – 2020) |
UNDP |
2013-2014 |
Completed |
||
|
17 |
Contract No. 05/CHPOV-TW-CS - Consulting service on Research capacity of district and commune officials
|
- Project: Technical assistance Subproject for preparing Central Highlands Poverty Reduction Project - Fund: WB - Client: PMU of Central Highlands Poverty Reduction project - Total investment: 150,000,000 USD - Project Group A |
- Conduct a capacity assessment study for district and commune officials
|
World Bank |
2013 - 2014 |
Completed |
||
|
18 |
Contract No. 0708/ICT-Ayunpa/LBCTK/HDTV - Consulting service on Making final report of the project (Completion report of the project)
|
- Project: Investment in Vocational Training Equipment for AYUNPA Vocational Intermediate School - Fund: Korea ODA - Client: PMU Investment in Vocational Training Equipment for AYUNPA Vocational Intermediate School - Total investment: 3,000,000 USD |
- Making final report of the project (Completion report of the project)
|
Korea ODA |
2013 - 2014 |
Completed |
||
|
19 |
- Contract No.: 141211/HD_TV - Consulting service on Preparation of reports to support the evaluation of Korea - Eximbank bank for the project "Construction of Pharmacy University in Bac Ninh" |
- Project: Construction of Hanoi Pharmacy University - new facility in Bac Ninh province - Fund: Korea ODA - Client: Hanoi Pharmacy University - Total investment: 57,000,000 USD - Project group A/level I |
+ Research, investigation and evaluation on gender equality + Research, investigation and evaluation of ethnic minorities
|
Korea ODA |
2011 - 2014 |
Completed |
||
|
20 |
- Contract No.: 39/2012/HDTV - Consulting service on Preparation of report to support “Construction and Expansion of Quang Ngai city water supply system (from 20,000m3 to 45,000m3/day)” |
- Project: Construction and Expansion of Quang Ngai city water supply system (from 20,000m3 to 45,000m3/day)” - Fund: ADB - Client: Quang Ngai water supply and construction joint stock company - Total investment: 20,000,000 USD |
+ Research, investigation and evaluation on gender equality + Research, investigation and evaluation of ethnic minorities
|
ADB |
2012 - 2013 |
Completed |
||
|
21 |
- Contract No.: 79B/2011/HD-TN&PTDT - Consulting service on Preparing investment project on work construction, geological and topography survey, environmental impact assessment, social investigation report, resettlement report |
- Project: Collection and treatment of wastewater in Long Dien town, Long Dien district, Ba Ria Vung Tau province - Fund: Spain ODA - Client: Ba Ria Vung Tau Urban Sewerage and Development One Member Limited Company - Total investment: 100,000,000 USD - Project group A/level I |
+ Research, investigation and evaluation on gender equality + Research, investigation and evaluation of ethnic minorities
|
Spain ODA |
2011 - 2013 |
Completed |
||
|
22 |
- Contract No.: 18/2010/HDTV-TCDL-LDNT - Consulting service on Procurement, implementation of core bank system for EVN Finance |
- Project: Procurement, implementation of core bank system for EVN Finance - Fund: Enterprise - Client: EVN Finance - Total investment: - Project Group A |
- Consult to support the selection of core banking solutions (business software and data center) including: + Assess the status: Review the strategic business development, review organizational structures and resources, review business operations, business processes and operation of information technology, technology application and infrastructure… + Set up a solution request profile: Organize key user sessions to collect requirements for Core banking system and data center. Propose a comprehensive solution for Core banking system. Make requirements for professional, technical, and contractor’s functions. Develop criteria to assess proportion of technical and financial factors, assessment criteria for selection of core banking system and selection of solutions for the Data Center and development of Bidding Documents based on standards appropriate with EVN Finance. + Evaluate and select suppliers. - Consult on monitoring the project of implementation of core banking system. |
Enterprise |
2010-2011 |
Completed |
||
|
23 |
- Contract No.: 01/2017/HDTV-ODA - Consulting service on preparation of investment project + Environmental impact assessment report (EIA), + Social impact assessment study (SA) + Resettlement Action Plan (RAP) and resettlement policy framework (RPF) |
Project: Project on Construction of Hai Phong General Hospital - Part I (part using ODA loans) using Korean ODA loans. - Fund: Korea ODA - Governing agency: Hai Phong City People's Committee - Client: Hai Phong Department of Health - Project management unit: PMU of the project on Construction Viet Tiep Friendship Hospital facility 2 (under Hai Phong Department of Health) - Total investment of the period: 104,000,000 USD - Project Group A / level I |
- Prepare Environmental impact assessment report (EIA), + Social impact assessment study (SA) + Research, investigation and evaluation on gender equality - Prepare Resettlement Action Plan (RAP) and resettlement policy framework (RPF)
|
Korea ODA |
2017 |
Completed |
||
|
24 |
- Contract No.: 08/2014/HDTV/ICT-BV Cho Ray - Consulting service on project preparation (Feasibility study repport) + Environmental Impact Assessment (EIA) + Social impact assessment (SA) + Prepare Resettlement Action Plan (RAP) and resettlement policy framework (RPF) |
- Project: Construction of facility II – Cho Ray Hospital - Fund: Japan ODA - Client: Cho Ray Hospital - Total investment of the phase: 287,957,000 USD (equal to 5,702,982,000,000 VND) - Project group A/level I |
- Environmental Impact Assessment (EIA) + Social impact assessment (SA) + Research, investigation and evaluation on gender equality + Prepare Resettlement Action Plan (RAP) and resettlement policy framework (RPF) |
Japan ODA |
2014-2015 |
Completed |
||
|
Our Company will present contracts upon request. |
||||||||